How long does it take to install a full smart home
system?
Short Answer:
A full smart home system deployment timeline varies depending on whether it’s
new construction or a retrofit and the complexity of the project. New
construction is usually 2-4 years, while a retrofit could be done in as little
as 1 month.
Timeline Breakdown:
Design
& engineering: 2 weeks
Pre-wire
(new builds): aligned with construction
Installation:
2–8 weeks (depending on scope)
Programming
& tuning: ongoing through completion
Key Factor:
Smart home systems are typically installed in phases alongside the builder—not
as a one-time install.